Skip to content
MP Swimming Pools

Building a fiberglass pool in Salt Lake City

Salt Lake City already reviews pools under the 2024 pool code, wants a soils report no more than two years old, and won't close your permit until the fence passes. A pool fence here can go up to 10 feet, as long as it's at least 80% see-through above 6 feet.

Salt Lake City’s pool rules

Checked October 2026. Rules change, so we confirm with the city before design.

Permit needed
Pools deeper than 24 in.Source
Code used
2024 ISPSC, with Utah's waste-water amendmentSource
Permit fee
Based on the total construction value of all tradesSource
Barrier
Shown on the plans; the permit isn't closed until it's metSource
Pool fence height
Up to 10 ft if at least 80% transparent above 6 ftSource
Pool equipment
At least 4 ft from the property line in side and rear yardsSource
Accessory buildings
At least 1 ft from side and rear lines and 4 ft from the house; a pool-specific yard rule wasn't retrievedSource
Soils report
Geotechnical report no more than 2 years old; otherwise 1,500 psf presumptive bearingSource
Frost depth
30 in.Source
Weathering / seismic
Weathering “Severe”; seismic design category D2Source
Outlets
At least one receptacle 6–20 ft from the inside wall; GFCI on 15/20-A outlets within 20 ftSource
Overhead lines
10 ft horizontal or 22.5 ft vertical clearanceSource
Drain safety
Suction outlet entrapment protection checked at plan reviewSource

What it means for your design

The 10-foot fence rule helps on close city lots. Up to 6 feet the fence can be solid, for privacy. The extra height above that has to be at least 80% see-through, so think glass or slim metal pickets on top, not more boards.

Pool equipment sits at least 4 feet off a side or rear line. That's the only equipment-siting rule we found in any of our cities, and on a narrow lot it decides where the pad goes. We place it so the noise stays on your side of the fence.

Because the permit stays open until the barrier is right, the fence isn't something we leave for later. It goes on the first set of plans, gates and latches included.

Frost and freeze-thaw shape the deck. Fence posts and footings near the pool go below 30 inches, and so does the plumbing. Coping and pavers are chosen for ‘Severe’ weathering; pavers can be specified to ASTM C1645, the freeze-thaw and de-icing salt test.

With a short season, heat is worth deciding early. A heat pump struggles below about 45°F, so May and October swimming usually means gas or a hybrid heater. The automatic safety cover on every MP pool also saves roughly half or more of the heating bill.

Salt Lake City ground, frost and season

Salt Lake City is the one city on our list that publishes its ground numbers. Frost reaches 30 inches. The weathering class is ‘Severe’. The seismic category is D2. And if there's no geotechnical report from the last two years, the design has to assume 1,500 pounds per square foot of bearing.

The county health department's water rules apply here as they do across the valley. Backwash goes to the sanitary sewer. Pool water can go on your own landscaping only when the sewer isn't possible, with chlorine under 0.1 mg/L and none of it running off your property. Fines reach $10,000 a day.

The swim season is short. Salt Lake City's 30-year normals put May lows around 50°F and October lows around 44°F, and local service companies close pools in September or October.

Salt Lake City questions

How tall can a pool fence be in Salt Lake City?

Up to 10 feet, if the part above 6 feet is at least 80% transparent. The state minimum for a pool barrier is 48 inches.

Does Salt Lake City need a soils report for a pool?

SLC's design criteria want geotechnical reports no more than two years old. Without one, the design falls back on a presumptive bearing value of 1,500 pounds per square foot. A current report tells the engineer what's actually under your yard.

How is the pool permit fee figured in Salt Lake City?

On the total construction value of all the trades involved, per the city's April 2026 checklist. So the fee depends on your project. We'll work it out from the written price.

Free backyard consultation

Jason’s next open consultation:Wednesday, November 4

Jason books consultations about three weeks out on purpose. Before he walks your yard, he looks up your lot: the plat, the easements, your city’s pool and fence rules, and your HOA. That way the ideas he shows you will actually pass. Request that week or any later one.

Spring 2027 dig dates are booking now.

Families who want to swim by summer usually sign over the winter. Engineering, the permit and HOA approval all come before the first shovel. Herriman’s permit review alone runs 10 to 15 working days.

  • This requests a consultation, not a build date. No deposit, nothing to sign.
  • Jason calls or texts within one business day to set an exact time.
  • No price over the phone. A written price after he has seen your yard.

Rather talk first? Call Jason: 385-202-3342

Which week works?

Jason will call or text to set the time.

So Jason can look up your lot before he comes.

Add a note for Jason

Jason walks your yard with you, answers your questions, and shows you what will fit. No cost and no pressure. We never share your details.

Free backyard consultation

Start with a walk around your Salt Lake City yard.

Jason will come out, look at what you’ve got, and show you what’s possible: the pool, the fence, the yard around it. No cost, no pressure, and a written price before anything starts.

Next open consultation: Wednesday, November 4 · or call Jason: 385-202-3342

Book free consultationCall